Natomas East

Sacramento, CA

PROJECT OVERVIEW

More Information

345,000 square foot twelve (12) story midrise office building, both core and shell with a full penthouse. Roof top mechanical system consisting of: two (2) 395 ton chillers, two (2) 3,000 MBH heating hot water boilers, three (3) cooling towers, two (2) 1,185 GPM and one (1) 500 GPM. Site has a street level service yard that stores a 14,000 gallon fire water storage tank that serves as the irrigation supply for the landscaping. This tank is filled from the blow down water off of the cooling towers that would normally go to a drain. The sanitary drain, waste, vent systems as well as the domestic water systems have low flow and waterless fixture design that falls in line with the LEED® requirements for this project. Site area is approximately 15 acres. This building has achieved LEED® Gold status.

  • Owner: Bannon Investors, Inc.
  • General Contractor: HMH Builders, Inc.
  • Project Value: $4,370,000
  • Project Delivery/Contract Type: Traditional Contract with IPD Construction Methodology
  • Start/Finish Dates: November 2006 – November 2009
  • Facebook
  • Twitter
  • Instagram
  • LinkedIn
CONSTRUCTION
CONTACT